Laserfiche WebLink
f• <br /> Cf) 0 <br /> fl7 O <br /> CDC <br /> CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> E: p <br /> Imlementation Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Date <br /> { 0 Responsibility Action <br /> Completed <br /> qualified biologist and DFG determine it would <br /> o. not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> Cn <br /> m may be required if the activity has potential <br /> adversely affect the nest. <br /> CD <br /> San Joaquin Kit Fox Before construction SJCOG,in <br /> < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a completed no more USFWS and DFG <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> or construction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas. Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> Standardized Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groun <br /> o' Disturbance(USFWS 1999). <br /> < If no active dens are found during the surveys,a <br /> letter report documenting the survey methodology <br /> a and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> before the start of ground disturbance or <br /> C- construction activity,and no further mitigation <br /> C <br /> mshall be necessary. <br /> ' <br /> 0 < Any known or potential dens discovered within <br /> ' the survey area shall be monitored for 3 days to <br /> D determine its current use. If no activity is observed <br /> nduring this period,the den shall be destroyed <br /> W >immediately to preclude subsequent use. If kit fox <br /> activity is observed, the den shall be monitored for <br />