Laserfiche WebLink
CO C <br /> W o <br /> :3 — <br /> c_ <br /> n C College Park at Mountain House Specific Plan III <br /> _. as Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> land uses,the operation of on-site landscape <br /> maintenance equipment shall be limited to the <br /> tn <br /> least noise-sensitive periods of the day,between <br /> CD the hours of 7:00 a.m. and 10:00 p.m. <br /> Cn <br /> CD 4.13-3 Noise—Increased Traffic Noise After construction S7CCDD, in <br /> The project applicants shall implement the measures conjunction with the <br /> identified below. developer <br /> < Before occupancy of the first residence at <br /> College Park, a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> w Grant Line Road between Central Parkway and <br /> �^ the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the EIR)and the northern travel lane of <br /> Grant Line Road.The noise barriers may consist <br /> of a wall,berm, or combination thereof. The <br /> exact location, height,and character of the noise <br /> Ebarrier shall be determined by a noise consultant <br /> v approved by the County.The sound barrier shall <br /> o' reduce outdoor noise levels at the center of the <br /> front yards of the five existing residences to <br /> 0 below 65 dBA Ldn/CNEL. If Grant Line Road is <br /> o widened at this location subsequent to <br /> construction of the sound barrier but before <br /> W removal of the five residences under Specific <br /> +� Plan II, the sound barrier shall be relocated,as <br /> CD required. If the five existing residences are <br /> removed under Specific Plan 11 before occupancy <br /> ' of the first residence under the College Park <br /> -0 project, this mitigation measure shall not require <br /> ca <br /> 8M implementation. This mitigation shall be funded <br /> ig > through fair-share payments by the College Park <br /> developers. <br />