Laserfiche WebLink
i;: M <br /> ;= 0 <br /> co' D <br /> College Park at Mountain House Specific Plan III <br /> o' <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> a Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> Q 4.13-4 Noise—Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> X exceeding Predicted Noise Levels conjunction with the <br /> oThe College Park developers shall implement the developer; in <br /> following measures: consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> the first residence proposed under the College consultant <br /> o ' <br /> co Park project along each of the seven arterial <br /> v <br /> 3 segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm, or combination thereof. The exact location, <br /> rn height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County, The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> proposed adjacent single-family residences to <br /> C below 65 dBA Ld„ICNEL and as close to 60 dBA <br /> aD <br /> CD Ldp/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> College Park developers. <br /> 0 <br /> C) <br /> m <br /> =. <br /> o <br /> CD <br /> 0 -0 <br /> CD <br /> C. n <br /> -• -h <br /> n � <br /> o v <br /> c � <br />