Laserfiche WebLink
C, <br /> r. <br /> Cn 0 <br /> W o <br /> 0 <br /> CD College Park at Mountain House Specific Plan III <br /> �• Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> C Mitigation Measure Timing/Schedule Date <br /> o Responsibility Action <br /> Completed" <br /> < Agricultural Activity, Industrial,and Before construction SJCCDD, in <br /> Commercial Noise.Before the approval of conjunction with the <br /> building permits for each individual subdivision, developer; in <br /> SJCCDD shall evaluate the building permits for consultation with a <br /> CD <br /> compliance with the San Joaquin County qualified acoustical <br /> Development Title.Where individual projects do consultant <br /> not clearly comply with interior noise standards <br /> m included in these guidelines, mitigation measures <br /> such as use of dual-pane windows,mechanical air <br /> systems,exterior wall insulation,and other noise- <br /> reducing building materials and methods shall be <br /> required as appropriate to reduce interior noise <br /> exposure to 45 dBA Ldn(Table 4,13-3 of the <br /> EIR), Where individual projects do not clearly <br /> comply with exterior noise standards of the San <br /> Joaquin Development Title (Table 4.13-3 of the <br /> EIR), mitigation measures, such as use of noise <br /> barriers,buildings for screening,and setbacks <br /> ' between noise sources and receptors, shall be <br /> o' <br /> implemented as appropriate to minimize exterior <br /> noise levels. Where there is a question regarding <br /> pre-mitigation or post-mitigation noise levels in <br /> a <br /> an area,site-specific noise studies maybe <br /> �• conducted to determine compliance or <br /> noncompliance with County guidelines. Any and <br /> Q all noise studies and mitigation required by the <br /> above shall be fully funded by the College Park <br /> CD <br /> o developers. <br /> Title 24'of the California Code of Regulations <br /> requires the preparation of an acoustical analysis <br /> 8 o for multifamily residences that demonstrates how <br /> 3 interior noise levels will achieve a 45-dBA <br /> Ld,,/CNEL in locations where the exterior noise <br />