Laserfiche WebLink
i i i i i i i i i I i 1 i i i i I i i <br /> U) 0 <br /> N p <br /> dCollege Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> _ aImplementation&Verification <br /> o Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> ° employing one of several methods outlined in <br /> = Section 5.2.4:15 of the SJMSCP.These include <br /> Nretention of tall vegetation,regular discing of the <br /> CD site, or use of chemicals or traps to kill ground <br /> Cl) squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> d activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found, the following measures shall be <br /> implemented: <br /> During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> K described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> d <br /> S During the breeding season(February 1 <br /> through August 31), occupied burrows shall <br /> 0not be disturbed and shall be provided with a <br /> ET' 250-foot protective buffer until and unless <br /> the Technical Advisory Committee, with the <br /> � concurrence of the permitting agencies' <br /> a representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> v <br /> have not begun egg laying or(2)juveniles <br /> o m from the occupied burrows are foraging <br /> y independently and are capable of <br /> independent survival.After the fledglings <br />