My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i i i i i i i i i I i 1 i i i i I i i <br /> U) 0 <br /> N p <br /> dCollege Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> _ aImplementation&Verification <br /> o Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> ° employing one of several methods outlined in <br /> = Section 5.2.4:15 of the SJMSCP.These include <br /> Nretention of tall vegetation,regular discing of the <br /> CD site, or use of chemicals or traps to kill ground <br /> Cl) squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> d activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found, the following measures shall be <br /> implemented: <br /> During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> K described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> d <br /> S During the breeding season(February 1 <br /> through August 31), occupied burrows shall <br /> 0not be disturbed and shall be provided with a <br /> ET' 250-foot protective buffer until and unless <br /> the Technical Advisory Committee, with the <br /> � concurrence of the permitting agencies' <br /> a representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> v <br /> have not begun egg laying or(2)juveniles <br /> o m from the occupied burrows are foraging <br /> y independently and are capable of <br /> independent survival.After the fledglings <br />
The URL can be used to link to this page
Your browser does not support the video tag.