Laserfiche WebLink
K rn <br /> = o <br /> n' D <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> ImplemeE Mitigation Measure Timing/Schedule Responsibility <br /> Date <br /> Responsibility Action <br /> Completed <br /> nare capable of independent survival,the <br /> 70 burrow can be destroyed. <br /> m <br /> 4.10-6 Biological Resources--Conversion of Common Before and during, SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> Active Nests <br /> 0 < The College Park developers shall request <br /> v coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> _ throughout much of the College Park site,but are <br /> concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields. During the SJMSCP application <br /> o process, SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> CD <br /> habitat. If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site, the <br /> RL <br /> SJMSCP incidental take avoidance and <br /> K minimization measures described below for <br /> nesting raptors shall be implemented. Additional <br /> d measures below shall be implemented to avoid <br /> x <br /> loss of active nests of common raptor species, <br /> which are not covered under the SJMSCP but are <br /> m protected under the California Fish and Game <br /> Code.The project applicants shall retain <br /> a qualified biologists to conduct all pre- <br /> construction surveys. <br /> o < White-tailed Kite.If project construction begins <br /> w <br /> 3 during the nesting season(February 15— <br /> September 15),pre-construction surveys shall be <br /> 1 1 1 1 1 1 I ! [ l 1 1 1 1 1 1 I 1 L <br />