Laserfiche WebLink
I I I I I I I I I I I I 1 I 1 I 1 1 1 <br /> C/) 0 <br /> N o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o °= Implementation <br /> &Verification <br /> e g Mitigation Measure Timing/Schedule <br /> 3 o Responsibility Action Date <br /> Completed <br /> �• begins during the nesting season(April 1—August <br /> 0 31),pre-construction surveys shall be conducted <br /> y during the nesting season in suitable nesting <br /> '0 habitat within 100 feet of areas of project <br /> activity.The survey shall be conducted within <br /> CD <br /> 0. the 2 weeks before construction or tree removal <br /> a begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during ' <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins during <br /> the nesting season(April 1—August 31),pre- <br /> RL construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity. A <br /> setback of 500 feet from California homed lark <br /> �• and tricolored blackbird nesting areas shall be <br /> ca established and maintained during the nesting <br /> M <br /> OL season for the period encompassing nest building <br /> A and continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> � the nesting season in the presence of nests that <br /> M are known to be occupied. Setbacks shall be <br /> p <br /> marked by brightly colored temporary fencing. <br /> 4.10-9 Biological Resources--Conversion of San Joaquin Before construction SJCOG, in <br />