Laserfiche WebLink
� m <br /> � o <br /> w' a <br /> o. <br /> College Park at Mountain House Specific Plan III <br /> = Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> o. Mitigation Measure Timing/Schedule Rate <br /> �. Responsibility Action <br /> Completed <br /> aduring the nesting season(February 15—August <br /> 31),pre-construction surveys shall be conducted <br /> CD <br /> -g during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity.The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins. If any active nests are found,a setback of <br /> 3 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> No ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG, in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to construction <br /> m under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park. During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> site supports suitable habitat for loggerhead shrike, <br /> 2 California homed lark, or tricolored blackbird. If <br /> o` cn SJCOG determines suitable habitat is present on or <br /> adjacent to a given project site, the following <br /> SJMSCP incidental take avoidance and minimization <br /> C-) v measures shall be implemented by the project <br /> japplicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br /> 1 1 1 1 t t 1 1 l t 1 1 I I I I I I I <br />