Laserfiche WebLink
rn <br /> Co 0 <br /> � 4 <br /> 0 CID College Park at Mountain House Specific Plan.M <br /> e Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule <br /> Responsibility Action ate <br /> Completed <br /> Er <br /> With-Project Conditions on Anticipated Network <br /> = For consistency with previously adopted roadway <br /> Nstandards, the County shall extend the standard of <br /> LOS D to the segment of Byron Road east of Grant <br /> v Line Road. <br /> CD <br /> Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> v implementation of Mountain House Master Plan <br /> (MHMP) EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road, <br /> 4.12, AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> K control measures during construction(see`Regulatory <br /> Setting,"above). <br /> The latest version of the San Joaquin Valley Air <br /> Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for Assessing and <br /> Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> v Development under College Park would be required by <br /> CL the SJVAPCD to implement the current version of the <br /> measures at the time individual development <br /> 0 applications are received by the County for <br /> �' development under College Park. <br /> 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction SJVAPCD, in <br /> O Contaminants(TACs) begins and during conjunction with the <br /> 3 > ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />