Laserfiche WebLink
Km <br /> 0 <br /> d College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> �. Responsibility Action <br /> Completed <br /> CL ► Mobile-Source TAC Emissions—The College <br /> M Park applicants for industrial or commercial land <br /> CDusesshall coordinate with the SNAPCD to <br /> assess situations in which toxic risk from diesel <br /> cc particulate matter(PM)may occur and to review <br /> methodologies that may become available to <br /> estimate the risk.The developers shall implement <br /> 3 any project-level measures adopted by the <br /> SNAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD, in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> c refuse piles are removed. <br /> to4.12-5 Air Quality—Increased Long-Term Regional Before construction SNAPCD,in <br /> v Emissions of Criteria Pollutants begins and during conjunction with the <br /> R_ The College Park developers shall implement all of construction developer <br /> m the mitigation measures as recommended in the <br /> 3 Guide for Assessing and Mitigating Air Quality <br /> Impacts(SNAPCD 1998).Many of these measures <br /> d are already included in the proposed project design <br /> and/or are already required by the MHMP and by <br /> 0 mitigation in the MHMP and Delta College EIRs. <br /> � m <br /> � Cn <br /> o � <br /> c <br /> S � <br /> c O1 <br />