Laserfiche WebLink
i l i l 1 1 i 1 1 i 1 I I i 1 i I i i <br /> � 0 <br /> da <br /> m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> nc <br /> Implementation &Verification <br /> o mentationMitigation Measure Timing/Schedule Impl <br /> o Responsibility Action Date <br /> 7Completed <br /> 5. 4.13. NOISE <br /> 0 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD, in <br /> CD Noise conjunction with the <br /> < Limit project construction activities to the hours developer <br /> m between 6:00 a.m.and 9:00 p.m.Q. - <br /> < Comply with the San Joaquin County <br /> v Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile, with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize navel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> m installed around stationary equipment, if <br /> 0 necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phaseSJCCDD, in <br /> Noise and doting conjunction with the <br /> �. The project applicants shall incorporate the measures construction developer <br /> m <br /> identified below into the project design. <br /> a Commercial,Office,and Industrial Uses <br /> .S Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA L,s during daytime hours <br /> Mo (7:00 a.m. to 10:90 p.m.)or 50 dBA Lis during <br /> nighttime hours(10:00 p.m. to 7:00 a.m.)at off-site <br /> noise-sensitive receptors. In addition, design and <br />