Laserfiche WebLink
i <br /> 1 <br /> MOONTA€N HOUSE PROPOSED ALTAMONT 1-IE[GHTsTENTAT[VE MAP 4. ENVIRONMENT <br /> AL CC-IECKLEST <br /> 4.15 T ANSPORTAMN/TRAFFIC <br /> Mitigation Measures <br /> No mitigation measures:are required, <br /> k e) Result in inadequate emergency-access? uxz J <br /> The proposed project would have a loop street system and three cul-de-sacs(Siegfried <br /> z <br /> Engineering, 2006). Turning radii on streets as well as of ends of the.cul-de-sacs would have <br /> to satisfy requirements of the MHCSD Development Standards in order to be adequate for <br /> access and egress by fire trucks and other emergency vehicles. With these design features, <br /> emergency access would be satisfactory. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> J) Result in inadequate parking capacity? <br /> Future developers of the individual parcels must meet the residential and commercial parking <br /> requirements that are enforced through the County Development Title and the MHCSD <br /> Design Guidelines. This impact would be less than significant. <br /> Mitigation Measures <br /> MEIR Mitigation Measure M4.12-6 addresses shared parking opportunities. A portion of the <br /> recommended text changes were made to the MHMP(EDAW, 2005b). No additional <br /> mitigation measures are required. <br /> g1 Conflict with adopted polices,plans, or programs supporting alternative transportation <br /> (e.g., bus turnouts, bicycle racks)? <br /> The proposed project would not conflict with adopted policies,plans,or programs supporting <br /> alternative transportation methods. Sidewalks would be provided along all streets and cul- <br /> de-sacs. A Class III.bike route would be provided along F Street on the eastern boundary of <br /> the project. A bus stop would be provided on F Street between C and E streets (Siegfried <br /> Engineering, 2006, Sheet 3). <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> SOURCES OF INFORMATION <br /> EDAW. 2005a. College Park at Mountain House, Specific Plan III, Revised Draft, June 10. <br /> EDAW. 2005b. Final Environmental Impact Report, College Park at Mountain House, <br /> Specific Plan III, Volume III, SCH#2003102074, June 24. <br /> f <br /> 4-78 <br />