My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006254
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600364
>
SU0006254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 3:43:59 PM
Creation date
9/5/2019 10:46:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006254
PE
2691
FACILITY_NAME
PA-0600364
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600364\SU0006254\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1070
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The entire South Community Park shall be designed to a 30% design completion level . <br /> I consistent with all Community Approvals including applicable provisions of the Parks, <br /> Recreation and Leisure Plan and the MHCSD Design Manual--The design,of:the park <br /> shall lie reviewed by both`the DCRC and MHCSD and' pproved bythe;MHCSD. <br /> Timing: condition'shall be met prior,to'issuance of,the first building perm it.wlthin,Tract <br /> 3646: : <br /> C. The MHCSD General Manager tray allow the South Community Park to be.constructed <br /> in phases to be consistertf witfz usage iiernand and oti er,put lic interest c06Side.rations. <br /> Final Construction Plans of the'first phase`of the South'Cornrnuni .Park shall;be <br /> completed before start of construction.. 'Construction of the First Phase of South. w .. <br /> Community Park shall begin'no later thairin the time at which`50% of-the dwelling units for <br /> Specific Plan III have been issued a building permit.' The Park shall be completed no . . <br /> later thAh the time at which`80%of dwelling units for the Specific Plan Ilf have'beeri <br /> issued building permits. Completion time of Park Phases and/or the entire park may be <br /> modified by the MHCSD General Manager to reflec#cotistrilction,`weather, budget,or <br /> other public interest contingencies. <br /> D. A formal agreement for joint use of parks and recreation facilities between the MHCSD <br /> and the Delta Community College District shall be required prior to approval of any <br /> Specific Plan III Final Map. If an agreement between.MHCSD and the College District is <br />' not finalized by that time, then 7.0 acres will be added to the community park to result in <br /> a park size equal.to 38 acres: ' <br /> k 35. Open Space Corridor: <br /> A. The design of all Open Space Corridor improvements including paths,alignment, <br /> standards, signage, fighting, and landscaping shall comply with all Community <br /> f Approvals including applicable provisions of the MHCSD Design Manual.•Timing: plans <br /> shall be reviewed and approved by MHCSD prior to approval of the first building permit. <br /> R. Site furniture, consistent with the common design theme of the neighborhood, shall be <br /> incorporated into the Improvement Plans for the Open Space Corridor and.shall be <br /> consistent with the MHCSD Design Manual. The site furniture shall be a part of the <br /> Open Space Corridor design plans and shall be reviewed and approved by the MHCSD.. <br /> Timing: plans shall be reviewed and approved by MHCSD prior to approval of the first <br /> building permit. <br /> C. Construction of Open Space Improvements may be completed on a phased basis to <br /> correspond with the development of neighborhoods; or parcels as determined by <br /> MHCSD directly adjacent to the facility. Open Space improvements to a specific <br /> segment shall be completed no later than the time at which 80% of dwelling units for the <br /> neighborhood, or adjacent parcels, have been issued building permits. Completion time <br /> may be modified by the MHCSD General Manager to reflect construction, weather, <br /> budget, or other public interest contingencies. <br /> D. Masonry Walls, consistent with the MHCSD Design Manual and MHCSD Standards, <br /> shall be constructed in all locations where residential properties abut Open Space <br /> Corridor areas. View Fencing or no fencing may be permitted in locations where <br /> residences face the Open Space Corridor as deemed appropriate by MHCSD. Timing: <br /> Improvement Plans approved by CDD and MHCSD prior to issuance of first building <br /> permit. <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.