Laserfiche WebLink
� c'3 <br /> o CD <br /> College Park at Mountain House Specific]Plan M <br /> C Mitigation Monitoring and Reporting Program. <br /> Implementation&Vetificatlon <br /> c Mitigation Measure Tim#nglScnedule Implementation <br /> o ResponsibilityAction Date <br /> Completed <br /> 4.2 LAND USE <br /> 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> Land Uses construction,and Community <br /> Cn The College.Park developers shall implement the During design phase Development <br /> following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD), in <br /> Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled. The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID - <br /> personnel and other authorized persons,and shall <br /> be developed in coo rd nation with BBID to <br /> G' ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&E-Chevron <br /> o easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> m line. to <br /> ci <br /> co <br /> 7� <br /> o M <br /> cn C7 <br /> 3 <br /> i <br />