Laserfiche WebLink
co' A <br /> College Park at Mountain House Specific Plan TTI <br /> Mitigation Monitoring and Reporting Program <br /> o Mitigation Measure Timing/Schedule <br /> Implementation Implementation A Verification <br /> ResponsibilityAction gate <br /> Completed <br /> n 4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> o Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> rr�itigation measure: <br /> o < At such time as the interim land disposal of <br /> c° treated wastewater at the Pombo property is <br /> 3 discontinued, GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> Z' < Before development, the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> n water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> us irrigation canals shall be approved by BBID. <br /> CD <br /> -o 4.6 CULTURAL RESOURCES <br /> a� <br /> 4.6-2 Cultural Resources-' Potential During'construction 11CCDD,in <br /> =' Destruction/Damage to Undiscovered Cultural conjtntction with the <br /> o Resources developer,and in <br /> If discovery of unknown cultural materials is made conjunction with <br /> during construction, ground-disturbing activities at qualified <br /> the construction site where the discovery was made archaeologist,if <br /> shall be halted. The College Park developers or needed. <br /> oconstruction contractor shall contact the San Joaquin <br /> sv (D County Community Development Department <br /> c (SJCCDD) immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> notified and retained by the College Park developer, <br /> The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />