Laserfiche WebLink
fn n <br /> W o <br /> CDc <br /> v College;Park at Mountain House Specific Plan III <br /> W Mitigation Monitoring-and Reporting Program <br /> Implementation <br /> !mp#ementation Verificat#on <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> employing one of several methods outlined in <br /> Section 5.2.4.15 of the SJMSCP.These include <br /> cretention of tall vegetation,regular discing of the <br /> site, or use of chemicals or traps to kill ground <br /> squirrels; <br /> CD <br /> �, ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review),The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found, the following measures shall be <br /> implemented: <br /> During the nonbreeding season(September I <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation, as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> o• During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> not be disturbed and shall be provided with a <br /> o' 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> CL representatives on the Technical Advisory <br /> 7 Committee, or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> • noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> M from the occupied burrows are foraging <br /> `g y independently and are capable of <br /> independent survival. After the fledglings <br />