Laserfiche WebLink
1 <br /> M rr <br /> � o <br /> co D <br /> • College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> M Implementation&Verification <br /> o. Litigation Measure Implementation <br /> Implementation <br /> Responsibility Action Date <br /> v Completed <br /> CL are capable of independent survival,the <br /> burrow can be destroyed. <br /> 4.10-6 Biological Resources—Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> Active Nests <br /> < The College Park developers shall request. <br /> B coverage under the SJMSCP,and fees shall be <br /> 3 paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> CO concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields.During the SJMSCP application <br /> process, SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> CD <br /> -� habitat. If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site,the <br /> v SJMSCP incidental take avoidance and <br /> o minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> treasures below shall be implemented to avoid <br /> loss of active nests of common raptor species, <br /> tiwhich are not covered under the SJMSCP but are <br /> m protected under the California Fish and Game <br /> Cn <br /> Code.The project applicants shall retain <br /> qualified biologists to conduct all pre- <br /> construction surveys, <br /> c < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15— <br /> `` — September 15),pre-construction surveys shall be <br />