Laserfiche WebLink
cn C7 <br /> m o . <br /> College Park at Mountain House Specific Plan IM <br /> Mitigation Monitoring and Reporting Program <br /> o °= Implementation implemehtation- Ve ifcation <br /> Mitigation Measure Timing/Schedule Responsibility pate <br /> ,� p Y Action Completed <br /> below: <br /> o Special-Status Plants Before construction SJCOG,in <br /> 0 < Before any ground-disturbing or vegetation- consultation with <br /> CD <br /> U) clearing activities,a qualified botanist shall USFWS and DFG <br /> conduct surveys for the special-status plant <br /> species identified in Table 4,11-1 of the EIR. <br /> b Surveys shall be conducted at the appropriate <br /> time, when the target species would be in flower <br /> and therefore clearly identifiable(i.e.,blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed.If no special- <br /> status plants are found,no further mitigation <br /> cNn shall be required. <br /> • If special-status plants are found.and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> m If special-status plant populations cannot be <br /> avoided,consultations with DFG and/or <br /> d USFWS may be required, depending on the <br /> listing status of the species present,These <br /> o consultations shall determine appropriate <br /> mitigation measures for any populations that <br /> would be affected by the implementation of. <br /> the proposed project.Appropriate measures <br /> m may include the creation of off--site <br /> populations through seed collection or <br /> �' • transplanting,preservation and enhancement <br /> z1 of existing populations,or restoration or <br /> M creation of suitable habitat in sufficient <br /> quantities to compensate for the impact. <br /> California Rect-Legged Frog Before construction S,FCOG,in <br />