Laserfiche WebLink
K rr <br /> �• a <br /> =' College Park at Mountain House Specific.Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implernentatton Implementation&Verifica#ion <br /> �o. Mitigation Measure Timing/Schedule Responsibility Date <br /> Action <br /> Completed <br /> ► Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> 78 Grant Line Road has potential to adversely affect <br /> California red-Iegged frog.It may be necessary <br /> to conduct a formal habitat assessment and <br /> osurveys to make such a determination.If it is <br /> determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted, and <br /> authorization for incidental take could be required. <br /> Q, Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.'These may include limiting <br /> m activities to certain seasons, g <br /> vegetation removal and in-water construction <br /> activities, conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> ^ construction areas.If necessary, appropriate <br /> ocompensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> z habitat and creation of additional habitat. <br /> cn � <br /> Swainson's Hawk Before construction SSCOG;in, <br /> o t < If project construction begins during the (surveys shall be consultation with DFG <br /> Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> DFG (March 1 to September 15);pre-construction prior to construction <br /> o m surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br />