Laserfiche WebLink
n <br /> • College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 2.0 <br /> Implementation Implementatlon.&1/e0ticati6n <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> �n <br /> v Completed <br /> o at least 5 consecutive days from the time of the <br /> ro observation, to allow any kit fox occupying the <br /> o den to move to another location.If it is not a natal <br /> or pupping den, use of the den can be discouraged <br /> cC1 <br /> during this period by partially plugging its <br /> o entrances) with soil in such a manner that any <br /> animal can escape easily. The den may be <br /> E destroyed when, in the judgment of a qualified <br /> biologist, it is no longer occupied by a kit fox or it <br /> is temporarily vacant.Methods for den destruction <br /> shall be in accordance with USFWS <br /> recommendations. <br /> CD < Occupied natal or pupping dens shall not be <br /> destroyed until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS. A 250-foot buffer zone shall be <br /> d maintained around natal dens until the biologist <br /> determines that the den has beenvacated. <br /> `( Additional provisions of the Standardized <br /> Recommendations for Protection of the San <br /> Joaquin Kit Fox Before or During Ground <br /> Disturbance(USFWS 1999),includirig those <br /> 0 for educating construction workers regarding <br /> kit fox,keeping heavy equipment operating at <br /> safe speeds,and checking construction pipes <br /> o for kit fox occupation during construction, <br /> Cbshall also be implemented, <br /> wJurisdictional Waters of the United States Before Construction SJCOG, in <br /> CD <br /> < The College Park Developers shall implement coordination with <br /> Mitigation Measure 4.10-10. DFG,USACE and/or- <br /> o RWQCB <br /> 4.11. TRAFFIC <br /> 4.11.1 Transportation--Effects on 2025 Cumulative Before construction. San Joaquin County <br />