Laserfiche WebLink
cn c� <br /> n� o <br /> College Park at Mountain House Specific Plan;rII <br /> Mitigation Monitoring and Reporting Program <br /> o �? Implementation implementation.&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> .� Completed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> N standards,the County shall extend the standard of <br /> LOS D to the segment of Byron Road east of Grant <br /> o Line Road. <br /> n <br /> Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP)EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construdtion SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> The latest version of the San Joaquin Valley Air <br /> ' Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for Assessing and <br /> Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> o repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> CL the SJVAPCD to implement the current version of the <br /> measures at the time individual development <br /> applications are received by the County for. <br /> ' development under College Park. <br /> LO <br /> v 4.12-2 Air Quality---Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> Contaminants(TACs) begins and during conjunction with the <br /> 1• Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1.. <br />