Laserfiche WebLink
Km <br /> College Park at Mountain House Specific Pian.III <br /> Mitigation Monitoring and Reporting Program. <br /> 0 <br /> S Mitigation Measure Timing/Schedule <br /> Implementation 1rnPlementation&Verification <br /> ResponsibilityAc tion Date <br /> aoperational standards shall be established to minimize Completed <br /> 7 noise generated by loading dock activities from <br /> adversely affecting planned and existing off-site <br /> noise-sensitive land uses. Design and operational <br /> measures may include: <br /> < Enclose outdoor noise-generating equipment <br /> and/or set back from the property line. <br /> < Locate buildings and structures such that they <br /> shield off-site sensitive receptors from on-site <br /> noise sources, including loading dock activity. <br /> < Enclose loading dock areas <br /> W < Limit loading dock activity,including delivery <br /> truck arrivals and departures, to between 7:00 <br /> a.m. and 10:00 p.m. at those loading docks with <br /> direct line of site of noise-sensitive receptors <br /> n within a distance of 1,000 feet.Activity at all <br /> other loading docks shall be limited to the hours <br /> between 5:00 a,m.and 10:00 p.m. <br /> Noise studies,including on-site sound level <br /> measurements, shall be conducted to ensure that these <br /> o� thresholds are not exceeded.The noise studies shall <br /> o be funded by the College Park developers and <br /> approved by SJCCDD before construction. <br /> v Landscape Maintenance <br /> m <br /> The following measures shall apply to noise- <br /> 0 0 generating activities associated with landscaping and <br /> ro maintenance of school grounds,neighborhood parks, <br /> .a community parks,and open space. <br /> raCD < On-site landscape maintenance equipment shall <br /> be equipped with properly operating exhaust <br /> o mufflers and engine shrouds,in accordance with <br /> manufacturers' specifications.For maintenance <br /> '� = areas located within 320 feet of noise-sensitive <br />