Laserfiche WebLink
cn n <br /> n� a <br /> College Park at Mountain House Specific Plan M. <br /> C Mitigation Monitoring and Reporting Program <br /> o Implementation <br /> Implementation&-Verification <br /> Mitigation Measure - Timing/Schedule <br /> Responsibitity Action Co Da efed <br /> a 4.13. NOISE <br /> n 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> C6 Noise conjunction with the <br /> m <br /> < Limit project construction activities to the hours developer <br /> coo between 6:00 a,m, and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed-or mobile,with propeily operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w <br /> recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> installed around stationary equipment,if <br /> a' necessary. <br /> 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> Noise and during conjunction with the. <br /> M. The project applicants shall incorporate the measures construction developer <br /> un identified below into the project design. <br /> Q Commercial, Office,and Industrial Uses <br /> Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA L.4 during daytime hours <br /> �$ om (7:00 a.m. to 10:00 p.m.)or 50 dBA L.,during <br /> > nighttime hours(10:00 p.m to'7:00 a.m.)at off-site <br /> noise-sensitive receptors.In addition,design and <br />