Laserfiche WebLink
a <br /> MITLGATION MONITORING AND REPOIRTING PROGRAM <br /> Fi INTRODUCTION <br /> In accordance with the California Environmental ualit .Aet CEQA.),San Joaquin County(County) and <br /> Gerry N.Kamilos,LLC{CNK,LLC),prepared.an.environmental impact report{Ent)that identifies <br /> 4 adverse impacts related to`tlie College.Park at Mountain House Specific Plan III Project.The EIR also <br /> identifies mitigation measures:that would reduce or eliminate these impacts. <br /> Section 21081:6.of the California Public Resources Code§15091:(d)and 15097 of the State CEQA <br /> Guidelines require public agencies"to adopt a reporting and monitoring program for changes to the <br /> project which it has adopted or made:a condition of.project approval in order to mitigate or avoid <br /> significant effects-on.the environment"A Mitigation Monitoring and Reporting Program(MMRP)is <br /> required for the College Paris at Mountain.House Specific Plan III Project because the EIR.for the project <br /> identified potentially significant adverse irripacts related to construction and implementation activities, <br /> and mitigation measures have been identified to mitigate those impacts. <br /> FAdoption of the MMRP will occur along with approval of the proposed project. <br /> PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> fly <br /> This MMRP has been prepared to ensure that all required mitigation measures are implemented and <br /> completed according to schedule and maintained in a satisfactory manner during the construction of the <br /> project,as required_The MMRP may be modified by San Joaquin County during project implementation, <br /> R as necessary, in response to changing conditions or other refinements.A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> monitoring/mitigation timing,responsible person/agency for implementing the measure, monitoring and <br /> reporting procedure,and space to confirm implementation of the mitigation measures.The numbering of <br /> mitigatiou.measures follows the numbering sequence found in the EIR_ <br /> ROLES.AND RESPONSIBILITIES <br /> Unless otherwise specified herein, San Joaquin County is responsible for taking all actions necessary to <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> demonstrating that the action has been successfully completed. San Joaquin County, at its discretion,may <br /> delegate implementation responsibility or portions thereof to the developer(GNK, LLC), a licensed <br /> contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> County staff members, and/or the construction contractor has completed the necessary actions for each <br /> measure. San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period. Duties of the project manager include the following: <br /> t <br /> < Ensure that routine inspections of the construction site are conducted by appropriate San Joaquin <br /> County staff; check plans,reports,and other documents required by the MMRP; and conduct report <br /> activities. <br /> < Serve as a liaison between San Joaquin County,the Mountain House Community Services District <br /> {MHCSD), and the construction contractor regarding mitigation monitoring issues. <br /> P, <br /> < Complete forms and maintain reports and other records and documents generated by the MMRP. <br /> j <br /> College Park at Mountain House Specific Plan III EDAW <br /> F1San Joaquin County 9 Mitigation Monitoring and Reporting Program <br /> i <br />