Laserfiche WebLink
l <br /> o College Park at Mountain House Specific Plan III <br /> N Mitigation Monitoring and Reporting Program <br /> n ?� Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule responsibility Action <br /> Date <br /> es <br /> Completed <br /> retention in-lieu of the required expansion of WQB 1, <br /> z before development of those portions of <br /> c Neighborhoods B and D to be served by the DeAnza <br /> CD Boulevard and Mountain House Parkway storm-drain <br /> Cn <br /> Systems. <br /> CD <br /> 4,$ WATER QUALITY <br /> 4.8-1. Water Quality—Potential Temporary NOI(s)submitted to MHCSD, in <br /> Construction-Related Water Quality Effects the Central Valley conjunction with the <br /> The College Park developers shall consult with the RWQCB before developer,and in <br /> Central Valley Regional Water Quality Control Board beginning of coordination with the <br /> (RWQCB)to acquire the appropriate regulatory applicable ground- Central Valley <br /> approvals that may be necessary to obtain Section disturbing or RWQCB <br /> 441 water quality certification,ensure compliance dewatering activities; <br /> with the State Water Resources Control Board water quality <br /> (SWRCB) statewide National Pollutant Discharge performance <br /> Elimination System(NPDES)stormwater permit for standards established <br /> general construction activity and the Central Valley before construction <br /> RWQCB NPDES permit for construction dewatering begins <br /> activity,and obtain any other necessary site-specific <br /> 0WDRs or waivers issued pursuant to the Porter– <br /> Cologne Act.As required under the NPDES <br /> siormwater permit for general construction activity, <br /> o the project applicant shall prepare a Stormwater <br /> M. <br /> Pollution Prevention Plan(SWPPP)and any other <br /> necessary engineering plans and specifications for <br /> � pollution prevention and control.The SWPPP and <br /> CD other appropriate plans shall: <br /> < Identify and specify the use of erosion and <br /> sediment control Best Management Practices <br /> (BMPs),means of waste disposal, <br /> M implementation of approved local plans,non- <br /> stormwater management controls,permanent <br /> postconstruction BMPs,and inspection and <br />