Laserfiche WebLink
K M <br /> D <br /> o. College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation 4 Verification <br /> a Mitigation Measure Timing/Schedule Res on5ibllit Date <br /> P Y Action Completed <br /> a. maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> CD <br /> during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> o < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> w <br /> B monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> - hazardous materials used for equipment <br /> °i operation and hazardous waste; <br /> a; < Identify emergency procedures for responding to <br /> spills; <br /> < Identify$MPs that shall be used in all <br /> v subsequent site-development activities; <br /> < Identify personnel training requirements and <br /> yprocedures that will be used to ensure that <br /> co workers are aware of permit requirements and <br /> 0-a proper installation and performance inspection <br /> methods for specified BMPs; <br /> 0 < Identify the appropriate personnel responsible for <br /> �-0—, supervisory duties related to implementation of <br /> the SWPPP; and <br /> < Require all construction contractors to retain a <br /> UN M ® E M EW M OW M (M M 00 UN M <br />