Laserfiche WebLink
m lw� unl I ill � ! t IEI 4:w <br /> I' 6J <br /> 0 0 <br /> � o <br /> .m College Park at Mountain House Specific Plan III <br /> C. Mitigation Monitoring-and Reporting Program <br /> 5 R <br /> . 00 Implementation&Verification <br /> oImplementation <br /> c Mitigation Measure Timing/Schedule <br /> a 0 Responsibility Action Date <br /> Completed <br /> employing one of several methods outlined in <br /> s Section 5.2.4.15 of the SJMSCP.These include <br /> retention of tall vegetation,regular discing of the <br /> fb site,or use of cher icals'or traps to kill ground <br /> rosquirrels; <br /> Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> v activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> —„ implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> ,burrowing Owls(DFG 1995). <br /> o During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> not be disturbed and shall be provided with a <br /> 6. 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> CL representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> -$ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> rn from the occupied burrows are foraging <br /> iv n independently and are capable of <br /> independent survival.After the fledglings <br />