Laserfiche WebLink
M <br /> Q <br /> cQ' A <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> a Implementation.&Verification <br /> o Mitigafion Measure Timing/Schedule <br /> implementation <br /> �. Responsibility Action Date <br /> Completed <br /> cc <br /> aare capable of independent survival,the <br /> burrow can be destroyed. <br /> CD <br /> 4.10-6 Biological Resources---Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> m Active Nests <br /> < The College Park developers shall request. <br /> E3 coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> O0 concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> fallow fields.During the SJMSCP application <br /> 2. process, SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> habitat.If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site,the <br /> m SJMSCP incidental take avoidance and <br /> minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> iv measures below shall be implemented to avoid <br /> loss of active nests of common raptor species, <br /> H which are not covered under the SJMSCP but are <br /> : protected under the California Fish and Game <br /> 0Code.The project applicants shall retain <br /> CD qualified biologists to conduct all pre- <br /> construction surveys. <br /> o < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15– <br /> September 15),pre-construction surveys shall be <br /> L� � C-1 C=3 C C <br />