Laserfiche WebLink
Km <br /> > <br /> Q. .College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o implementation&Verification <br /> Implementation <br /> o Mitigation Measure TiminglScheduie Date. <br /> _. Responsibility Acton <br /> Completed <br /> v <br /> during the nesting season(February 15–August <br /> ro 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity,The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> o <br /> begins.If any active nests are found,a setback of <br /> N 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporaryfencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> co Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> CD Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior tb.construction <br /> v under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> o site supports suitable habitat for loggerhead shrike, <br /> California horned lark,or tricolored blackbird.If <br /> CD <br /> o SJCOG determines suitable habitat is present on or <br /> cn adjacent to a given project site,the following <br /> ASJMSCP incidental take avoidance and minimization <br /> c7 measures shall be implemented by the project <br /> 0 Er <br /> applicants in consultation with a qualified biologist. <br /> -� - ¢ Loggerhead Shrike.If project construction <br /> CM -3 EM <br />