Laserfiche WebLink
� o <br /> `CD College Park at Mountain House Specific PIan III. <br /> Mitigation Monitoring and Reporting Program <br /> n Implementation,&Verification <br /> Mitigation Measure Timing/Schedule Implementation Date' <br /> A <br /> Responsibility Action <br /> Co pleted <br /> R. begins during the nesting season(April 1—August <br /> a 31),pre-construction surveys shall be conducted <br /> N during the nesting season in suitable nesting <br /> ro habitat within 100 feet of areas of project <br /> Cl) <br /> activity. The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins.during <br /> CQ <br /> the nesting season(April 1-August 3-1),pre- <br /> R' construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity,A <br /> setback of 500 feet from California horned lark <br /> a• and tricolored blackbird nesting areas shall be <br /> CO established and maintained during the nesting <br /> m <br /> a season for the period encompassing nest building <br /> and continuing until fledglings leave nests.This <br /> CD <br /> o setback applies whenever construction or other <br /> ? ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 4.10-9 Biological Resources---Conversion of San Joaquin Before construction SJCOG,in <br />