Laserfiche WebLink
r- r-" r 1 J i r r r- r r r r <br /> rn n <br /> a) O <br /> m College Park at Mountain House Specific Plan III <br /> �. Mitigation Monitoring and Reporting Program <br /> o = Implementation Implementation&Verification <br /> 0 Mitigation Measure Timing/Schedule <br /> Responsibilityate <br /> Action <br /> Completed <br /> �• 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing =and during San Joaquin County <br /> Land Uses constmction,and Community <br /> N The College Park developers shall implement the During design phase Development <br /> CV <br /> following measures; Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD), in <br /> Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> = are filled. The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons, and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety," to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> m gas pipelines within the PG&E–Chevron <br /> 0 easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> 0 <br /> = feet at the time of Tentative Map approval for <br /> o any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> W line. <br /> _ <br /> COn <br /> m <br /> S <br /> .D <br /> M <br /> a <br />