My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006254
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600364
>
SU0006254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 3:43:59 PM
Creation date
9/5/2019 10:46:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006254
PE
2691
FACILITY_NAME
PA-0600364
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600364\SU0006254\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1070
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Km <br /> � v <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> a Implementation <br /> g' Mitigation Measure Timing/Schedule Responsibility Action Completed <br /> n p <br /> n 4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD, in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> Act Contracts disposal developer <br /> a, The project applicants shall implement the following <br /> mitigation measure: <br /> < At such time as the interim land disposal of <br /> a <br /> treated wastewater at the Pombo property is <br /> W <br /> 3 discontinued,GNK, LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> A < Before development, the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> C-) water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> irrigation canals shall be approved by BBID. <br /> 4.6 CULTURAL RESOURCES <br /> M <br /> 4.6-2 Cultural Resources—Potential During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> K Resources developer, and in <br /> If discovery of unknown cultural materials is made conjunction with <br /> during construction, ground-disturbing activities at qualified <br /> X the construction site where the discovery was made archaeologist, if <br /> tishall be halted.The College Park developers or needed. <br /> � Cn <br /> construction contractor shall contact the San Joaquin <br /> $ 4 County Community Development Department <br /> c. (SJCCDD) immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> 0 U notified and retained by the College Park developer. <br /> —__ The archaeologist shall determine whether the <br /> < resource represents a"unique archaeological <br /> I l I I I I I I I I I I I I I I I I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.