Laserfiche WebLink
M <br /> a <br /> College Park at Mountain House Specific Plan III <br /> ° Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> o Mitigation Measure Timing/Schedule . Implementation Date <br /> Responsibility Action <br /> Completed <br /> nmaintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> CD <br /> during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> v <br /> o < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> B monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> 0o measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> n < Identify the types of materials used for <br /> o equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> `D hazardous materials used for equipment <br /> v <br /> m operation and hazardous waste; <br /> a; < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> n, subsequent site-development activities; <br /> x <br /> < Identify personnel training requirements and <br /> C/) N procedures that will be used to ensure that <br /> o m workers are aware of permit requirements and <br /> 0 � proper installation and performance inspection <br /> s 0 methods for specified BMPs; <br /> C. <br /> < Identify the appropriate personnel responsible for <br /> o x supervisory duties related to implementation of <br /> >_ >_ the SWPPP;and <br /> < Require all construction contractors to retain a <br />