Laserfiche WebLink
r r-r r F r - r r r r r U_ F- F�_ r- r- r-T r-- r-' r- <br /> Cn0 <br /> N 0 <br /> 0 College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0 Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Date <br /> P Y Action Completed <br /> � P <br /> copy of the approved SWPPP on the construction <br /> = site. <br /> 0 <br /> W 4.9 PUBLIC HEALTH AND SAFETY <br /> CD <br /> rn 4.9-1 Public Health and Safety—Possible Exposure to Before and during San Joaquin County <br /> Pre-Existing Hazardous Materials During construction; Environmental Health <br /> Construction Before demolition, Department and the <br /> v The College Park developers shall implement the renovation, or Central Valley <br /> following measures: modification of RWQCB,in <br /> < Project grading,excavation,and other earth- structures conjunction with the <br /> moving activities at the project site and off-site developer and a <br /> infrastructure locations shall be monitored at the qualified hazardous <br /> County's discretion by qualified hazardous materials expert <br /> materials experts(either qualified County staff or <br /> consultants) for signs of potential pesticide, <br /> hydrocarbon,or other contamination.If the <br /> County or consultants observe soil discoloration, <br /> noxious odors,or other signs of potential <br /> contamination,Phase II testing(excavation, <br /> <n laboratory testing of soil,possibly groundwater <br /> testing)shall be undertaken,and any <br /> recommendations made by the consultants shall <br /> be implemented. <br /> < The San Joaquin County Environmental Health <br /> n Department shall have regulatory authority over <br /> = the investigation and clean-up of contamination <br /> n from underground storage tank releases and would <br /> 70 <br /> provide"no further action required" <br /> 0 determinations for that source of contamination. <br /> All aboveground storage tanks(ASTs)and <br /> v underground storage tanks(USTs)at the project <br /> M <br /> o site shall be removed under the supervision of a <br /> E3 > qualified hazardous material expert in accordance <br /> with applicable regulations and removal permit <br />