Laserfiche WebLink
K m <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> ImplemeMitigation Measure Timing/Schedule Responsibility <br /> Date <br /> Responsibility Action Completed <br /> orequirements from the County Environmental <br /> A Health Department. Dairy waste ponds or any <br /> `D other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> requirements from the Central Valley RWQCB or <br /> the California Department of Toxic Substances. <br /> N This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts. If the testing <br /> reveals contamination, the regulatory agencies <br /> o shall be contacted, any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> on < Other potential existing sources of contamination <br /> (i.e.,septic systems,refuse piles,waste ponds, <br /> m electrical transformers containing PCBs)on the <br /> m project site and off-site infrastructure sites shall be <br /> ;l' identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> oaccordance with applicable regulations before <br /> construction. The applicant shall demonstrate to <br /> W. the County Environmental Health Department that <br /> = the above has taken place before issuance of <br /> m ti building permits.If the experts observe potential <br /> �D soil contamination or noxious odors associated <br /> Cn <br /> d with these facilities,the soils underlying these <br /> facilities shall be sampled and tested by the <br /> experts. If the testing reveals contamination,the <br /> regulatory agencies shall be contacted,any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br />