Laserfiche WebLink
r r r- r <br /> W0 <br /> v o <br /> B College Park at Mountain House Specific Plan III <br /> c Mitigation Monitoring and Reporting Program <br /> 5 RL <br /> 0m Implementation&Verification <br /> c Mitigation Measure Timing/Schedule Implementation <br /> c° Responsibility Action Date <br /> = Completed <br /> �• employing one of several methods outlined in <br /> = Section 5.2.4:15 of the SJMSCP, These include <br /> cretention of tall vegetation, regular discing of the <br /> CD site,or use of chemicals or traps to kill ground <br /> squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> v activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found,the following measures shall be <br /> Z� implemented: <br /> During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> K described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> m <br /> o During the breeding season(February 1 <br /> 3 through August 31),occupied burrows shall <br /> not be disturbed and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> the Technical Advisory Committee, with the <br /> concurrence of the permitting agencies' <br /> a representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> g noninvasive means that either(1)the birds <br /> a have not begun egg laying or(2)juveniles <br /> v <br /> Mo from the occupied burrows are foraging <br /> y independently and are capable of <br /> independent survival, After the fledglings <br />