Laserfiche WebLink
� m <br /> o <br /> m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Implementation <br /> g' Mitigation Measure Timing/Schedule Responsibility Action Date <br /> �. Completed <br /> oare capable of independent survival, the <br /> p burrow can be destroyed. <br /> M <br /> 4.10-6 Biological Resources--Conversion of Common Before and during. SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> Active Nests <br /> E3 < The College Park developers shall request <br /> 3 coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields. During the SJMSCP application <br /> process, SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> CD <br /> habitat.If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site, the <br /> RL <br /> Q) SJMSCP incidental take avoidance and <br /> K minimization measures described below for <br /> nesting raptors shall be implemented. Additional <br /> ET measures below shall be implemented to avoid <br /> loss of active nests of common raptor species, <br /> C which are not covered under the SJMSCP but are <br /> protected under the California Fish and Game <br /> o` o Code.The project applicants shall retain <br /> a qualified biologists to conduct all pre- <br /> construction surveys. <br /> o < White-tailed Kite.If project construction begins <br /> m <br /> during the nesting season(February 15— <br /> September 15),pre-construction surveys shall be <br /> I I I I I I I I I I I I I I I I I I I <br />