Laserfiche WebLink
M <br /> ro <br /> d College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> 0 Implementation <br /> g' Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> m uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> co particulate matter(PM)may occur and to review <br /> 'a methodologies that may become available to <br /> 23 <br /> estimate the risk.The developers shall implement <br /> any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4,12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> nwi The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> on refuse piles are removed. <br /> 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> o; the mitigation measures as recommended in the <br /> K Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> v are already included in the proposed project design <br /> and/or are already required by the MHMP and by <br /> N 0 mitigation in the MHMP and Delta College EIRs. <br /> d N <br /> � N <br /> 0 -8 <br /> N <br /> a0 <br /> c n <br /> � n <br /> 0 <br /> o d <br /> c � <br /> I I I I I I I I I I I I I I I I I I I <br />