Laserfiche WebLink
F r r r r r r r— r <br /> vo <br /> m College Park at Mountain House Specific Plan III <br /> 5. Mitigation Monitoring and Reporting Program <br /> RL <br /> 'n ` Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule <br /> Responsibility Action Date <br /> o Completed <br /> �• 4.13. NOISE <br /> 0 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the <br /> c Limit project construction activities to the hours developer <br /> CD between 6:00 a.m.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile, with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w recommendations. <br /> < Arrange all construction equipment and truck - <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> v installed around stationary equipment, if <br /> 0 necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD, in <br /> Noise and during conjunction with the <br /> �. The project applicants shall incorporate the measures construction developer <br /> v <br /> identified below into the project design. <br /> o Commercial,Office,and Industrial Uses <br /> CD Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA L,s during daytime hours <br /> $ p (7:00 a.m. to 10:90 p.m.)or 50 dBA L.,during <br /> 3 nighttime hours(10:00 p.m. to 7:00 a.m.)at off-site <br /> noise-sensitive receptors. In addition, design and <br />