Laserfiche WebLink
F—_ r r-- r-- r— r r r r_ r r r— r r— r— r— r-- r_ r-- <br /> vo <br /> w College.Park at Mountain House Specific Plan III <br /> c. Mitigation Monitoring and Reporting Program - <br /> s � <br /> n Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule <br /> Responsibility te <br /> Action te <br /> Completed <br /> P <br /> 22. land uses, the operation of on-site landscape <br /> o maintenance equipment shall be limited to the <br /> N least noise-sensitive periods of the day,between <br /> the hours of 7:00 am. and 10:00 p.m. <br /> CD 4.13-3 Noise—Increased Traffic Noise After construction SJCCDD,in <br /> The project applicants shall implement the measures conjunction with the <br /> identified below, developer <br /> < Before occupancy of the first residence at <br /> College Park, a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> w Grant Line Road between Central Parkway and <br /> the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the FIR) and the northern travel lane of <br /> Grant Line Road. The noise barriers may consist <br /> of a wall, berm,or combination thereof The <br /> exact location,height,and character of the.noise <br /> barrier shall be determined by a noise consultant <br /> approved by the County, The sound barrier shall <br /> 94 <br /> oreduce outdoor noise levels at the center of the <br /> = front yards of the five existing residences to <br /> o below 65 dBA Ldn/CNEL. If Grant Line Road is <br /> g widened at this location subsequent to <br /> M construction of the sound barrier but before <br /> removal of the five residences under Specific <br /> rs Plan II,the sound barrier shall be relocated,as <br /> required.If the five existing residences are <br /> $ removed under Specific Plan II before occupancy <br /> of the first residence under the College Park <br /> ro ect,this mitigation measure shall not <br /> � P require j 8 <br /> Mm implementation.This mitigation shall be funded <br /> 3 through fair-share payments by the College Park <br /> developers. <br />