Laserfiche WebLink
i� o <br /> > <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> 0 Implementation&Verification <br /> 2.o Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Acton Date <br /> Completed <br /> a 4.134 Noise—Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> 70 exceeding Predicted Noise Levels conjunction with the <br /> `D The College Park developers shall implement the developer; in <br /> following measures: consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> the fust residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> 3 segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm, or combination thereof The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County. The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA Ld,/CNEL and as close to 60 dBA <br /> CD L&/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> R' College Park developers. <br /> d <br /> 0 <br /> 0 <br /> c <br /> m <br /> 9' <br /> 2 <br /> C() 0 <br /> � m <br /> o Cn <br /> a <br /> 9' <br /> 0 v <br /> c <br />