Laserfiche WebLink
r r r r r r r r r r_ r IF r r r F_ <br /> rn 0 <br /> W O <br /> BCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0 dImplementation&Verification <br /> c Mitigation Measure Timing/Schedule Implementation Date <br /> c Responsibility Action <br /> = Completed <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> x Mountain House Parkway construction <br /> NThe following measures shall be implemented by the <br /> N College Park developers: <br /> N < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> m House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property, the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition, the berm <br /> shall be constructed by the College Park developers <br /> = using contoured and rounded slopes to avoid angular <br /> face slopes. This shall be done concurrent with <br /> o development of the pond. <br /> _ <br /> 0 <br /> _ <br /> d <br /> _ <br /> n <br /> C <br /> CD <br /> _ <br /> E3 m <br /> o <br /> 3 � <br />