Laserfiche WebLink
Moreover, EIP's May 2006 field survey found that the existing California ground <br /> ' squirrel burrows within the project site did not contain ahy evidence,of suitable <br /> burrowing activity by the kit fox. (Habitat Assessment page 91.)+The applicant <br /> will( equest coverage under the S.iMSCP and comply with`theriieasures in the <br /> SJMSCP and'the Specific Plan Ill for the protection of.kit fox. <br /> The rationale with respect to the third finding ("habitat of superior quality and <br /> superior or'comparable quality will be created or,restored t6-compensate,for the <br /> loss") is as follows: <br /> Ii <br /> The applicanf'will create or restore habitat of superior quantity and superior or <br /> comparable quality to compensate for the loss of wetlands as resu"It of the <br /> project. Prior to the;approval 'of.the' Final Map(s) for the project,the.'applicant <br /> will submit to the Community Development Department a Wetland ' <br /> Mitigation/Replacement Plan (Wetland Plan) prepared .by a qualified biologist. <br /> The Wetland Plan Will include the following provisions which are incorporated <br /> as Tentative Map Conditions of Approval: <br /> a) There shall be no degradation of the.habitat or numbers of any rare, <br /> threatened, or endangered plant,or animal species as a result of the project. <br /> b) Wetland habitat of'superior quantity and superior or comparable quality will <br /> be created or restored to compensate for the loss General Plan Policy VI, G, <br /> 1). Replacement vegetation generally shall be native vegetation (General <br /> Plan,Volume 1, Policy VI, G, 15). l <br /> c) 1.02 acres of wetland will be filled as a result of the project(Draft Wetland <br /> Delineation Report Golden State Investments II, LP Property February 2006). <br /> The applicant shall replace'the lost wetland with 1.02 acres of wetland <br /> (General Plan, Volume 1, Policy VI, G, 5; Master Plan, Implementation 7.3,6 <br /> d) The Wetland Plan shall be consistent with all Federal, State,and local <br /> regulations(Master Plan, Implementation 7.3.6(k); Specific Plan Ill, <br /> Implementation Measure 7.3.4.3 (e)). ; <br /> e) The-Wetland Plan shall show the location and extent of existing wetlands on <br /> the site of the proposed project. <br /> f) The Wetland Plan shall indicate sites that are to be developed or preserved <br /> to serve as mitigation for loss of wetlands as a result of the proposed <br /> project. To the extent practical, mitigation sites shall be in the Mountain <br /> House Creek corridor. If replacement in the Mountain House Creek corridor <br /> is not feasible, replacement shall be within San Joaquin County. <br /> I <br /> g) Provisions shall be made for maintaining replacement wetland for a <br /> minimum of five(5) years. <br /> h) Assurance of wetland preservation shall be by conservation easement or <br /> other acceptable methods. <br /> In addition to the above,with regard to riparian habitat, the applicant will <br /> prepare a Riparian Habitat Mitigation Plan for the elimination of riparian habitat l <br /> on the site, pursuant to Community Development Department Condition of <br /> ) <br /> i <br /> 3 <br />