My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1. MOUNTAIN HOUSE COMMUNITY SERVICE DISTRICT (Staff Contact, <br /> Gabriel Karam, 209-$31-5609) <br /> 1. GENERAL: <br /> A. All subdivision improvements including but'not limited to subdivision improvement plans, <br /> specifications and master utility plans shall be in conformance with Cornrnunity, <br /> Approvals, including but not limited to the improvement.Standards a6d Specifications of <br /> the Mountain House Community Services District(MHCSD),the Design,Manual,Master <br /> .Plan, Specific Plan III, master utility plans, and other standards and plans.adopted by <br /> the MHCSD. These improvement plans and specifcations,must be approved by the. <br /> MHCSD prior to approval of each phased Final Map. The plan check fees shall be <br /> made with the submittal of the improvement plans and the field inspection-services costs <br /> shall be made to the MHCSD prior to signing of the improvement-plans.., if the actual <br /> costs exceed the estimated costs, the developer shall pay the balance within 30 days <br /> i upon receiving an Invoice from the MHCSD. <br /> B. The developer shall comply with all requirements of State, Federal,°SP 111, SP III EIR, <br /> including but not limited to County, State and Federal.requirements relative to air quality, <br /> storm water discharge,waste disposal and.hazardous waste and the mitigation <br /> measures contained in the EIR for the Tentative Map. <br /> C. All onsite and offsite easements and dedications shown on and proposed for the <br /> Tentative Map shall be dedicated to the MHCSD or offer of dedication to the MHCSD <br /> shall be recorded on the Final Map. Dedication of public rights-of-way shall be in <br /> conformance with the adopted Public Land Equity Program (PLED). Any easements to <br /> be abandoned that belong to Byron Bethany Irrigation District(13130)shall not be <br /> abandoned without prior approval of BBID.Timing: condition shall be met prior to <br /> approval of Final Map. <br /> D. All services performed by the MHCSD on any development project will be paid by the <br /> applicant at the full cost including overhead as determined by the MHCSD General <br /> Manager. The General Manager may set an interim fee as'a deposit and reconcile to <br /> the final cost at least annually. <br /> E. Except where provided otherwise in a Project Acquisition Agreement, prior to the <br /> recording of any Final Map, all infrastructure facilities outside the boundary of the <br /> Tentative Map (water, sewer, storm drainage, electric power, natural gas, telephone, <br /> communications, etc.)necessary to serve Tract 3646 shall be in place and fully <br /> operational. The MHCSD General Manager may defer the installation of a facility if it can <br /> be demonstrated to the satisfaction of the MHCSD General Manager that it is not <br /> required for the phase of Tract 3646 being developed. Any deferral will require the <br /> developer to provide the MHCSD a bond insuring the eventual construction of the facility <br /> F. All conditions on the"Will Serve'letter from the Mountain House Community Services <br /> District shall be met prior to approval of Final Map.The MHCSD General Manager may <br /> defer the installation of a facility if bonding is provided and it can be demonstrated to the <br /> satisfaction of the MHCSD General Manager that it is not required for the phase of Tract <br /> 3646 being developed. <br /> G. All reference to approvals herein by the MHCSD shall be interpreted as approval by the <br /> General Manager or his designee except for those approvals specifically delegated by <br /> law to the Board of Directors. <br /> H. All references to bonding shall mean a bond or any other security acceptable to <br /> MHCSD. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.