Laserfiche WebLink
f - <br /> MITIGATION M0NITORING AND.REPORTING PROGRAM <br /> INTRODUCTION <br /> In accordance with the California Envir,04mental Quality Act•(CEQA);San Joaquin Coun Coun a <br /> Gerry N_KamllOS LLC(GNK,LLC).,;prepared ail�tavtronrnetltal impact report En thatidentifies(y) nd <br /> ( . .) _ <br /> adverseimpacts related to the College.Park at Mountaui Douse Specific Plan III Project.The EIR also <br /> identifies trutigation measures-that would reduce or elimina <br /> to these i <br /> impacts. <br /> .p <br /> Section 21081:6 of the Public Resources Code§15 <br /> t791(d)and 15t}97 of the State CEQA <br /> Guidelines require public agencies 416 adapt a reporting and irzon(d)ain <br /> Q <br /> Project which it has adopted O—r, rade a condition of.project approval in order o mit or g avoid. <br /> required <br /> significant effects on the environnicat:"A MitigationMonitorin .and Re <br /> rcguired for the College Park at.Mountain.House Specific Pian III.PrQject because the porting Program <br /> or�h�e project. <br /> identified potentially significant adverse impacts related to.construction and implementation activities <br /> and Mitigation measures have been identified to mitigate those impacts. <br /> Adoption of the MMRP will occur along with approval of the proposed project. <br /> PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> This MMRP has been prepared to ensure that all required mitigation measures are irnpiemented and <br /> completed according to schedule and maintained in a satisfactory manner during the construction of the <br /> project,as required.The MMRP may be modified by San Joaquin County during project implementation, <br /> as necessary, in response to changing conditions or other refinements-A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> monitoring/mitigation tinting,responsible person/agency for implementing the measure, monitoring and <br /> reporting procedure, and space to confirm implementation of the mitigation measures_The numbering of <br /> mitigation measures follows the numbering.sequence found in the EIR. <br /> ROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein, San Joaquin County is responsible for taking all actions necessary to <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> demonstrating that the action has been successfully completed. San Joaquin Coun t <br /> delegate implementation responsibility or portions thereof to the developer(GNKtyLLC)Sa licensed may <br /> contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> County staff members, and/or the construction contractor has completed the necessary actions for each <br /> measure. San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period. Duties of the project manager include the following: <br /> < Ensure that routine inspections of the construction site are conducted by appropriate San Joaquin <br /> County staff; check plans, reports, and other documents required by the MMRP; and conduct report <br /> activities. <br /> < Serve as a liaison between San Joaquin County, the Mountain House Community Services District <br /> (MHCSD), and the construction contractor regarding mitigation monitoring issues- <br /> < Complete forms and maintain reports and other records and documents generated by the MMRP- <br /> College Park at Mountain House Specific Plan III <br /> San Joaquin County1 EDAW <br /> Mitigation Monitoring and Reporting Program <br />