Laserfiche WebLink
�Y <br /> < .Coordinate and ensure that corrective actions or enforcement measures are taken,if necessary. <br /> The responsible party for.each item of implementation will identify the staff members responsible for <br /> coordinating with San Joaquin County on the MMRP. <br /> ANNUAL REPORTING <br /> S.an Joaquin County shall.prepare an anmiaU miomtoring report.until.coinoletiofi of the proJecf bn the <br /> compliance of the activity with the required mitigation measures.Information regardrng:periodic <br /> inspections and other requirements shall be compiled and explained m the annual repoit,`The report shall <br /> be designed'to simply and clearly identify whether mitigation measures are being,:orhave been, <br /> adequately implemented.At a minimum,each report shall identify the mitigatiohmeasure measure's conditions <br /> to lie monitored for implementation,whether compliance with the mitigation measures or conditions has ( <br /> occurred, the procedures used to'assess compliance,and whether further action is required. <br /> M)IT11GATION MONITORING AND REPORTING.TABLE i <br /> . I` <br /> The annual report submitted will verify the implementation of mitigation measures.The MMRP Table <br /> that follows should guide San Joaquin County in their evaluation and should be the basis for annual <br /> reporting. <br /> The column categories identified in,the MMRP Table are described below. <br /> Mitigntion Number—This column lists the mitigation measures according to the number in the EM. <br /> Mitigation Measure--This column provides the text of the mitigation measures identified in the EIR. <br /> Timing/Schedule- This column lists the time frame in which the mitigation will take place. <br /> Implementation Responsibility—This column identifies the entity responsible for complying with the <br /> requirements of the mitigation measure.In most cases,the construction contractor will be responsible for <br /> conforming with the mitigation measure. <br /> Implementation and Verification—These columns are for verifying compliance.The"Action"column. <br /> describes the type of action taken to verify implementation_The"Date Completed"column is to be dated <br /> and initialed by the project manager,or hislher designee,based on the documentation provided by the <br /> construction contractor, its agents(qualified individuals),or through personal verification by San Joaquin <br /> County. <br /> EDAW College Park at Mountain House Specific Plan 111 <br /> Mitigation Monitoring and Reporting Program 2 San Joaquin County <br /> I : <br />