Laserfiche WebLink
Fzm <br /> r: o <br /> SD g College Park at Mountain House Specific Pian III <br /> 0 Mitigation Monitoring and Reporting Program <br /> oimpiementationz Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> n4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim-land conjunction with the <br /> Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> rn mitigation measure: <br /> < At such time as the interim land disposal of <br /> treated wastewater at the Pombo property is <br /> discontinued, GNK, LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e., feed crops). <br /> 4,2-5 Land Use and Agriculture—Conflicts with Before construction conCune <br /> tion with the <br /> Adjacent Agricultural Operations developer,er andira <br /> < Before development,the project developers shall , <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> irrigation canals shall be approved by BBID. <br /> 4.6 CULTURAL RESOURCES <br /> 4.6-2 Cultural Resources--Potential. During'construction SJCCDD,in <br /> w Destruction/Damage to Undiscovered Cultural devconeloper, <br /> with�e <br /> developer,and in <br /> o Resources conjunction with <br /> If discovery of unknown cultural materials is made 1 <br /> during construction,ground disturbing activities at qualified <br /> archaeologist,if <br /> z the construction site where the discovery was made needed, <br /> shall be halted.The College Park developers.or <br /> CD construction contractor shall contact the San Joaquin <br /> County Community Development Department <br /> c (SJCCDD) immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> 0 = notified and retained by the College Park developer, <br /> The archaeologist shall determine whether the <br /> -� resource represents a "unique archaeological <br />