Laserfiche WebLink
ami o <br /> m <br /> College Park at Mountain House Specifie Plan III <br /> Mitigation Monitoring and Reporting program <br /> r) w <br /> Mitigation Measure Implementation implementation&Verification <br /> 9 TiminglSchedule <br /> Responsibility Action Date <br /> m' 4.2 LAND USE Completed <br /> B <br /> s <br /> o 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> roLand Uses construction, and Community <br /> C/) The College Park developers shall implement the During design phase Development <br /> c0.o following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD), in <br /> - Irrigation District(BBID)canals from proposed <br /> conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled. The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID x BBI <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals'for maintenance activities. <br /> < implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9, "Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> v gas pipelines within the PG&F Chevron <br /> ' easement that bisects the project site. <br /> K < Identify an agricultural buffer of no less than 104 <br /> feet at the rima of Tentative Map approval for <br /> any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> v line. <br /> CL <br /> m <br /> cQ <br /> M <br />