Laserfiche WebLink
rr <br /> a <br /> ' College Park at Mountain House Specific-Plan III <br /> Mitigation Monitoring and Reporting Program <br /> a Implementation <br /> Implementation&VMficMon <br /> o Mitigation Measure Timing/Schedule Date. <br /> �. Responsibility Action <br /> Completed <br /> aduring the nesting season(February 15—August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within,500 feet of areas of project <br /> as activity. The survey shall be conducted within <br /> -a the 2 weeks before construction or tree removal <br /> 0 <br /> begins.If any active nests are found,a setback of <br /> v 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> oN ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 4.10-7 Biological Resources— Conversion of Other Before construction SJCOG, in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> CD Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to,construction <br /> under the STMSCP, and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application'process, <br /> SJCOG will determine whether that specific pfoject <br /> o site supports suitable habitat for loggerhead shrike, <br /> California horned lark,or tricolored blackbird.If <br /> a SJCOG determines suitable habitat is present on or <br /> nadjacent to a given project site, the following <br /> . S SJMSCP incidental take avoidance and minimization <br /> measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> -� = < Loggerhead Shrike.If project construction <br />