My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v o <br /> College Park at Mountain House Specific plan M'. <br /> Mitigation Monitoring and Reporting Program <br /> Im ! Implementation-&ve. rifdation' <br /> o Mitigation Measure TiminglSchedule P ementa6an <br /> .� Responsibility Action Date <br /> begins during the nesting season(April 1—AuCompleted <br /> gust <br /> a 31),pre-construction surveys shall be conducted <br /> y during the nesting season in suitable nesting <br /> C° habitat within 100 feet of areas of project <br /> activity. The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored tenporary fencing, <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins.during <br /> the nesting season(April I-August 31),pre. <br /> construction surveys shall beconducted during <br /> D <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity.A <br /> o. setback of 500 feet from California horned lark <br /> and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> a season for the period encompassing nest building <br /> ro and continuing until fledglings leave nests. This <br /> o setback applies whenever construction or other <br /> �. ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> Bm are known to be occupied. Setbacks shall be <br /> b marked by brightly colored temporary fencing. <br /> TI -9 Biological Resources---Conversion of San Joaquin Before construction S,ICOG,in a <br />
The URL can be used to link to this page
Your browser does not support the video tag.